From 1 - 1 / 1
  • The Institute of Estuarine and Coastal Studies (IECS) was commissioned by Forewind Ltd to carry out a Phase 1 biotope survey of the intertidal zone located between the towns of Redcar and Marske-by-the-Sea, Tees estuary, Teesside. This area has been identified as a preferred landfall location for export cables, with the ultimate aim of connecting offshore wind farms off the Teesside coastline to the National Grid. The intertidal survey was completed as part of the development of the Environmental Impact Assessment (EIA) required from Forewind Ltd to continue with the proposal to use this area as a landfall site.